Find the stock level at which to place your next order: the demand you expect while the order is on its way, plus a safety stock for the weeks that go above plan. Enter the safety stock yourself, or derive it from a service level.

Demand and lead time
units/day

Units sold per day, over a period like the coming weeks

days

From placing the order to having the stock ready to sell

Safety stock
units

Extra units held in case demand or delivery runs above plan

Your results

Place an order when your stock, counting units already on order, falls to 380 units.

Reorder point
380
Average daily demand × lead time + safety stock
Demand during lead time
280
Average daily demand × lead time
Safety stock
100
As entered
Days of cover at the reorder point
19

Safety stock derived from a service level, and the reorder point, are rounded up to whole units. The service level method assumes demand is roughly normally distributed and the lead time is fixed.

The start values are illustrative data.

Both ways to set safety stock, worked through for the start values.

Illustrative data. An example product sells 20 units a day on average and takes 14 days to arrive after ordering.

Safety stock entered

Safety stock is 100 units.

Reorder point with a safety stock you enter, worked through for the calculator’s start values
StepCalculationResult
Demand during lead time20 units a day × 14 days280 units
Safety stockAs entered100 units
Reorder point280 + 100380 units
Days of cover380 ÷ 20 units a day19

When stock, counting units already on order, falls to 380 units, place the order. If demand holds, 100 units are still on the shelf when it lands.

Safety stock from a service level

The service level is 95% and the standard deviation of daily demand is 6 units.

Reorder point with safety stock derived from a service level, worked through for the calculator’s start values
StepCalculationResult
z-score95% service level1.645
Square root of lead time√14 days3.74
Safety stock1.645 × 6 × 3.7436.9 units
Rounded up36.9 → whole units37 units
Demand during lead time20 units a day × 14 days280 units
Reorder point280 + 37317 units
Days of cover317 ÷ 20 units a day15.9

A 95% service level needs 37 units of safety stock here, so the reorder point is 317 units. A higher service level raises it.

What goes into the reorder point, and what to compare it with.

Average daily demand

Units sold per day, averaged over a period that looks like the coming weeks. For a seasonal product, use the seasonal average, not the yearly one.

Lead time

Days from placing the order to having the stock ready to sell, including production, shipping and goods-in. Use the realistic figure, not the supplier’s best case.

Safety stock

Extra units for demand or delivery above plan. Enter it directly, or derive it from a service level and the standard deviation of daily demand.

Stock position

Compare the reorder point with stock on hand plus units already on order, not stock on hand alone. Otherwise you order again while the first order is on its way.

A reorder point belongs to one product, because demand and lead time differ for each. Inventory Insights projects demand per product and works back from supplier lead time and a safety buffer to a reorder date, and warns you when that product’s reorder window opens.

Reorder point questions, answered.

How do you calculate the reorder point?

Multiply average daily demand by the lead time in days, then add safety stock. With 20 units sold a day, a 14-day lead time and 100 units of safety stock, the reorder point is 20 × 14 + 100 = 380 units.

Does the reorder point include safety stock?

Yes. Without it you reorder just in time, and any late delivery or sales spike causes a stockout. At the start values the demand during the lead time is 280 units and safety stock adds 100 units.

How do I get the safety stock for the formula?

Either choose the number of days of extra cover you want, or derive it from a service level: z × standard deviation of daily demand × √lead time. At 95% (z = 1.645), a standard deviation of 6 units and a 14-day lead time that is 37 units, and the reorder point becomes 317 units.

What is the difference between a reorder point and a reorder date?

A reorder point is a stock level; a reorder date is the day you expect to reach it. Inventory Insights works in dates, per product.

When do I place the order?

When stock on hand plus units already on order falls to the reorder point. At the start values that is 380 units. Recalculate when demand or lead time changes: a level that was right in spring can be wrong by autumn.

Embed this calculator

Paste this script tag into your own page to show the calculator there, with the same maths and no sign-up. It fits the width of your page, resizes with the calculator and follows the visitor’s light or dark setting.

The script adds the calculator and a link to the full version under it. Keep the attribution link: it credits the calculator.

Get a reorder date for every product, not one reorder point for your shop.

Inventory Insights projects demand per product and works back from supplier lead time and a safety buffer to a reorder date, and warns you when that product’s reorder window opens. Stock cover also feeds the labels your campaigns use, so products you cannot deliver lose priority.

Analyse your products for freeLog in with Google, no credit card
See how Inventory Insights works