Reorder point
The reorder point is the stock level at which you place a new order, so the stock you hold lasts through the supplier lead time with a buffer left.
By Berend Vrakking, founder of Product Metrics. Updated 13 November 2026.
Reorder point formula and how to calculate it
Reorder point = daily demand × lead time in days + safety stock
Daily demand is the average units sold per day. Lead time is the days from placing the order to receiving the stock. Safety stock is the extra stock you hold in case demand or delivery varies.
Reorder point example
| Step | Value |
|---|---|
| Product | Trail Runner 2 |
| Daily demand | 20 units |
| Supplier lead time | 14 days |
| Demand during lead time (20 × 14) | 280 units |
| Safety stock (5 days × 20) | 100 units |
| Reorder point (280 + 100) | 380 units |
When stock of Trail Runner 2 falls to 380 units, place the order. If demand holds at 20 units a day, 100 units are still on the shelf when the delivery lands. Illustrative data.
Put it into practice
- Calculate it: Reorder point calculatorWork out the stock level that triggers a reorder.
- Read the guide: Dead stock inventoryReorder from sales, lead time and a buffer, so stock does not go dead.
Reorder point: one product and the whole account
A reorder point belongs to one product, because daily demand and supplier lead time differ for every product. One threshold for the whole shop, such as “reorder at 50 units”, warns too late for a fast seller with a slow supplier and too early for a slow seller with a fast one.
Inventory Insights skips the fixed threshold. It projects demand per product and works back from the supplier lead time and a safety buffer to a reorder date, then leaves the decision to order with you.
Reorder point: common mistake
Setting a reorder point once and trusting it forever. The right level depends on that product’s demand and its supplier’s lead time, and both drift, so a level that was right in spring can be wrong by autumn.
Reorder point: questions
How do you calculate the reorder point?
What is the difference between a reorder point and safety stock?
What is the difference between a reorder point and a reorder date?
Keep reading
- Inventory InsightsA reorder date per product, from projected demand, supplier lead time and a safety buffer.
- Safety stockThe buffer that is added to demand during the lead time.
- Lead timeThe days between ordering and receiving stock.
- StockoutWhat a reorder point is meant to prevent.
Also available in